File #: File ID 2643    Version: 1 Name:
Type: Agenda Item Status: Approved
File created: 3/19/2014 In control: Flood Control District Board
On agenda: 4/1/2014 Final action: 4/1/2014
Title: Award Direct Select Award of Contract No. CT-FC-14-347 for flood control engineering services for the High School Wash Water and Sewer Plans and Associated Post Design Services Project begun under Qualified Consultants List (QCL) Contract No. CT-FC-13-592. As a result of significant changes required by the U.S. Army Corps of Engineers, additional design and post-design work will be required. The consultant had nearly completed the original scope of work within the value of the original QCL contract and the contract was allowed to expire in January 2014, however, the additional work required will bring the QCL contract over the $250,000.00 limit established in Board Policy D29.1 and necessitate an extension. HDR Engineering, Inc., requires an additional $46,400.00 to complete the design and provide post-design services. The District is contracting with HDR Engineering, Inc., on a direct select basis, under the authority of Board of Supervisors Policy D29.1(C) and (D), and A.R.S. ?34-1...
Attachments: 1. FC_AwardCT-FC-14-347
Title
Award
Direct Select Award of Contract No. CT-FC-14-347 for flood control engineering services for the High School Wash Water and Sewer Plans and Associated Post Design Services Project begun under Qualified Consultants List (QCL) Contract No. CT-FC-13-592. As a result of significant changes required by the U.S. Army Corps of Engineers, additional design and post-design work will be required. The consultant had nearly completed the original scope of work within the value of the original QCL contract and the contract was allowed to expire in January 2014, however, the additional work required will bring the QCL contract over the $250,000.00 limit established in Board Policy D29.1 and necessitate an extension.  HDR Engineering, Inc., requires an additional $46,400.00 to complete the design and provide post-design services. The District is contracting with HDR Engineering, Inc., on a direct select basis, under the authority of Board of Supervisors Policy D29.1(C) and (D), and A.R.S. §34-103, for design and post-design flood control engineering services. The contract shall be for an eleven month period in an amount not to exceed $46,400.00. The District also seeks to retroactively initiate the contract from February 1, 2014, to maintain continuity with the prior contract. The contract may be extended as required for project completion.  Funding Source: Flood Control Tax Levy.  Administering Department: Regional Flood Control District.