Skip to main content
File #: File ID 18277    Version: 1 Name:
Type: Agenda Item Status: Approved
File created: 1/8/2025 In control: Flood Control District Board
On agenda: 1/21/2025 Final action: 1/21/2025
Title: Hearing - Rulemaking Enactment of Pima County Regional Flood Control Technical Procedure 111 and Amendments to the Design Standards for Stormwater Detention and Retention Manual ORDINANCE NO. 2025 - FC2, of the Board of Directors of the Pima County Flood Control District, adopting new Technical Procedure 111 Interim Use of Rough Grading Statement in lieu of as-built certification and amending the Design Standards for Stormwater Detention and Retention Manual to conform to the Technical Procedure and Floodplain Management Ordinance.
Attachments: 1. FC_RulemakingEnactment_TechProcedure111, 2. FC_CAMemo_ProposedRevisionstoFCDRegs_1-15-25

Title

Hearing - Rulemaking Enactment of Pima County Regional Flood Control Technical Procedure 111 and Amendments to the Design Standards for Stormwater Detention and Retention Manual

ORDINANCE NO. 2025 - FC2, of the Board of Directors of the Pima County Flood Control District, adopting new Technical Procedure 111 Interim Use of Rough Grading Statement in lieu of as-built certification and amending the Design Standards for Stormwater Detention and Retention Manual to conform to the Technical Procedure and Floodplain Management Ordinance.