Title:
|
Hearing - Rulemaking Enactment of Pima County Regional Flood Control Technical Procedure 111 and Amendments to the Design Standards for Stormwater Detention and Retention Manual
ORDINANCE NO. 2025 - FC2, of the Board of Directors of the Pima County Flood Control District, adopting new Technical Procedure 111 Interim Use of Rough Grading Statement in lieu of as-built certification and amending the Design Standards for Stormwater Detention and Retention Manual to conform to the Technical Procedure and Floodplain Management Ordinance.
|